My last three days in Cyprus were full of excavation, bumper cars, and the odd game of 500. As for excavation, I was a little disappointed that I could not close out my trench. It was not a matter of man-power, as Justin, Rachel, and Jon were excellent diggers, just time. I am not worried, however, it is in excellent hands. We hit bedrock on the north side of the north wall so, with the exception of the extreme southern end of the trench, the stratigraphy should be pretty straight forward (floor, fill, and then bedrock).
I am in Turkey now with the Mopsos Survey Project on an incredibly slow Turkcell dial-up modem. I would like to thank all the PKAP staff and students for one of my most enjoyable years. Now let’s see if I can load at least one photo…
Comments